Project
Procurement and installation of pre-fabricated system for treatment and disposal of municipal wastewater of Asklipieio, Rhodes Island
Employer
Municipality of Southern Rhodes
Contractor
MESOGEOS SA
Capacity
1.000 pe
Budget
198.880 €
Duration
09/2009-12/2009
The installed system consists of the following units:
- prefabricated screening unit
- prefabricated pretreatment unit
- prefabricated equalization tanks
- pre-fabricated unit for the continuous biological treatment with the method of suspended solids and recirculation of activated sludge (MBBR – Moving Bed Bio-Reactor). The unit has the size and dimensions of a container.
- prefabricated sludge storage and thickening tank
- disinfection unit with sodium hypochlorite
- Pre-fabricated effluent storage tank