Employer
GREVENA WATER SUPPLY AND SEWAGE MUNICIPAL ENTERPRISE
Contractor
MESOGEOS SA-ATHONIKI TECHNIKI SA
Capacity
35.000 pe
Budget
6.447.258 €
Design and construction of a wastewater treatment plant. The plant includes three lines of biological treatment with oxidation ditches, denitrification, dephosphorization and tertiary treatment in Travelling bridge filters. The effluent is disposed in the Grevenitis river.