Expansion and Upgrade of the Wastewater Treatment Plant of the Municipality of Argostoli



Employer

Municipality of Argostoli

Contractor

ITHAKI SA-MESOGEOS SA

Capacity

30.000 pe

Budget

2.592.440 €

Duration

12/2003-3/2006

Doubling of capacity and upgrade of the biological treatment with the method of prolonged aeration. The final capacity of the facility will rise to 30,000 PE. The facility includes secondary treatment with simultaneous nitrification-denitrification. The disposal takes place with an underwater pipe of 600 m length, in the sea.