Aetos Wastewater Treatment Plant

Employer

Perfecture of Peloponnese

Contractor

MESOGEOS ENVIRONMENTAL SERVICES (100% subsidiary of MESOGEOS)

Capacity

3.000 pe

Budget

1.101.626

Duration

07/2012-06/2014

The contract includes the design, construction and 9-month operation of a WWTP  that consists of the following:

  • inlet pumping station
  • equalization tank
  • sewage pre-treatment unit
  • two (2) biological treatment containers (denitrification, nitrification, sedimentation, as well as the auxiliary equipment)
  • sludge dewatering container
  • sand filter
  • effluent storage tank
  • sludge thickening tank
  • outlet piping