Wastewater Treatment facility in Poros-Skala of the municipality of Elios-Pronnon

Employer

Municipality of Elios-Pronnon

Contractor

ITHAKI SA (subsidiary of MESOGEOS GROUP)

Capacity

13.000 pe

Budget

5.779.571 €

The project includes the design and construction of a wastewater treatment plant in the Municipality of Elios-Pronnon. The biological treatment of the wastewater is based on the activated sludge method. The facility includes a sewage waste reception unit, a pre-treatment unit, two lines of biological treatment, disinfection with a chlorination system, and finally post-aeration before their final disposal. The produced sludge is mechanically thickened-dewatered.