Retrofit of Aigio Wastewater Treatment plant

Employer

Aigio Water Supply and Sewage CO SA

Contractor

JOINT VENTURE MESOGEOS SA-AAGIS SA

Budget

10.295.200 €

Duration

12/2012-………………………

The contract includes the expansion and upgrade of Aigio WWTP. The plant had a capacity of 40.000 pe and operated with the method of extended aeration.
The project includes the construction of an MBR unit with a capacity of 30.000 pe that will work in parallel with the prior treatment line, which will be upgraded. The scope of the project is to have a capacity of 70.000 pe with the option to expand the capacity up to 98.000 pe.