Employer
Municipality of Chalkidona
Contractor
J/V THALIS E.S. SA-MESOGEOS SA
Capacity
8.684 pe
Budget
4.650.000 €
The contract includes the design, construction and operation of a WWTP with 3.952 m3/day capacity that consists of the following treatment steps:
- Reception and pretreatment of sewage
- Compact pretreatment unit consisting of screening, grit and FOG removal
- Biological treatment unit with the method of activated sludge
- Chlorination-Dechnlorination unit
- Sludge storage and thickening tank
- Building works
The project also includes all the necessary infrastructures of the plant, such as landscaping, fence etc.