Chalkidonas and Adendrou Wastewater Treatment Plant

Employer

Municipality of Chalkidona

Contractor

J/V THALIS E.S. SA-MESOGEOS SA

Capacity

8.684 pe

Budget

4.650.000 €

The contract includes the design, construction and operation of a WWTP with 3.952 m3/day capacity that consists of the following treatment steps:

  • Reception and pretreatment of sewage
  • Compact pretreatment unit consisting of screening, grit and FOG removal
  • Biological treatment unit with the method of activated sludge
  • Chlorination-Dechnlorination unit
  • Sludge storage and thickening tank
  • Building works

The project also includes all the necessary infrastructures of the plant, such as landscaping, fence etc.