Procurement and installation of pre-fabricated system for treatment and disposal of municipal wastewater of Asklipieio, Rhodes Island

 

Project

Procurement and installation of pre-fabricated system for treatment and disposal of municipal wastewater of Asklipieio, Rhodes Island

Employer

Municipality of Southern Rhodes

Contractor

MESOGEOS SA

Capacity

1.000 pe

Budget

198.880 €

Duration

09/2009-12/2009

The installed system consists of the following units:

  • prefabricated screening unit
  • prefabricated pretreatment unit
  • prefabricated equalization tanks
  • pre-fabricated unit for the continuous biological treatment with the method of suspended solids and recirculation of activated sludge (MBBR – Moving Bed Bio-Reactor). The unit has the size and dimensions of a container.
  • prefabricated sludge storage and thickening tank
  • disinfection unit with sodium hypochlorite
  • Pre-fabricated effluent storage tank