Water Treatment Plant at Pineios Artificial Lake in Amaliada

Employer

Municipality of Amaliada

Contractor

MESOGEOS SA (50%)

Capacity

2.014 m3/h

Budget

11.694.516,32 €

Duration

06/2009-06/2015

The project consists of the design and construction of a potable water treatment plant at the artificial lake of Pineios in Ilia and the six-month trial operation. The project includes all the necessary works from water abstraction to the outlet networks connected to the distribution system.
The plant briefly consists of the following units:

  • Water abstraction – water supply pipe
  • Screening
  • Ozonation unit
  • pH correction unit
  • Rapid mixing
  • Flocculation
  • Precipitation
  • Refining unit (filters)
  • Disinfection with chlorine gas
  • sludge treatment plant (thickening tank, dewatering unit)