Employer
Municipality of Amaliada
Contractor
MESOGEOS SA (50%)
Capacity
2.014 m3/h
Budget
11.694.516,32 €
Duration
06/2009-06/2015
The project consists of the design and construction of a potable water treatment plant at the artificial lake of Pineios in Ilia and the six-month trial operation. The project includes all the necessary works from water abstraction to the outlet networks connected to the distribution system.
The plant briefly consists of the following units:
- Water abstraction – water supply pipe
- Screening
- Ozonation unit
- pH correction unit
- Rapid mixing
- Flocculation
- Precipitation
- Refining unit (filters)
- Disinfection with chlorine gas
- sludge treatment plant (thickening tank, dewatering unit)